The Subantando site has been zoned as an industrial area with the intent to move a number of industrial business’s out of the town of Cabinda itself. Power and water currently run along the main road, less than a kilometre to the site, which will be investigated as a supply for the processing plant as part of the final design. The studies required to obtain the environmental and construction licence are currently being expedited.